{ "culture": "en-US", "name": "", "guid": "", "catalogPath": "", "snippet": "This feature depicts the 100yr (1%AEP) flood extent for Davistown as detailed in the Davistown and Empire Bay Floodplain Risk Management Study & Plan (Rhelm, 2021).", "description": "
Davistown catchment is a sub<\/SPAN>\u2010<\/SPAN><\/SPAN>catchment of the Brisbane Water Estuary, which connects to Broken Bay. The Davistown and Empire Bay Floodplain Risk Management Plan (FRMP) has been prepared for Central Coast Council in accordance with the New South Wales (NSW) Flood Prone Land Policy and the principles of the Floodplain Development Manual (NSW Government, 2005).<\/SPAN><\/P> In addition to the FRMS and FRMP, a separate climate change adaptation study was undertaken by Council (Rhelm, 2020b) to identify feasible strategies to adapt the low lying areas of Davistown and Empire Bay to the impacts of sea level rise.<\/SPAN><\/SPAN><\/P> The <\/SPAN>1%AEP <\/SPAN>flood extents were filtered to remove depths less than 0.1m.<\/SPAN><\/P> <\/P><\/DIV><\/DIV><\/DIV>",
"summary": "This feature depicts the 100yr (1%AEP) flood extent for Davistown as detailed in the Davistown and Empire Bay Floodplain Risk Management Study & Plan (Rhelm, 2021).",
"title": "Flooding_100_yr_GOS_Davistown_FRMSP_2021",
"tags": [
"Davistown",
"Flooding",
"100yr Flood Extent",
"1%AEP"
],
"type": "",
"typeKeywords": [],
"thumbnail": "",
"url": "",
"minScale": 150000000,
"maxScale": 5000,
"spatialReference": "",
"accessInformation": "Rhelm",
"licenseInfo": ""
}